Push Up Leggings EL-14762 - Dark Gray/L
Fashionable Push Up Leggings EL-14762 at a great price. The leggings are strong, seamless and suitable for exercise. The push up effect helps every woman achieve a beautifully rounded and shaped bottom. Every woman looks great in these leggings. They are comfortable and made of quality material.
Specification:
- Color: Dark Gray/L
- Material: 95% Polyester, 5% Elastane
- Waist: Elastic waistband
- Non-see-through
- Wash at 30°C or hand wash program
- Do not bleach
- Do not iron
- Do not tumble dry
- Do not dry in direct sunlight
| Size | L |
Customer reviews
No reviews yet
Be the first to write a review!
Questions & Answers
Have a question? Ask us.
No questions yet
Be the first to ask a question!
Safety (GPSR)
In accordance with Regulation (EU) 2023/988 on general product safety (GPSR), we provide the following information.
Product
Important Safety Notice for Leggings in accordance with Regulation (EU) 2023/988 on General Product Safety (GPSR)
This is a targeted safety notice for the proper and safe use of leggings (leisure, sports/compression, thermal, seamless, high-waisted, with mesh or reflective elements). Due to elastic materials, breathability, compression, possible sheerness, and skin contact, please follow the instructions below.
Basic Safety and Handling Principles
- Correct size and fit: Choose a size that does not restrict blood circulation or movement; do not wear excessively tight compression leggings for prolonged periods.
- Sheerness and material integrity: Check seams and transparency when stretched before wearing; damaged or weakened parts may tear.
- Flammability: Synthetic fibers are flammable and may melt; keep them away from open flames, sparks, and hot surfaces.
- Items in pockets: Sharp objects (keys, pins) can tear the material and injure the skin; carry them separately.
Proper and Safe Use
- Activities: For sports, choose a model with appropriate compression, breathability, and anti-slip features; for cycling, prefer specific cycling pants with padding.
- Temperature and overheating: For high exertion and heat, choose breathable materials; discontinue use if overheating or skin irritation occurs.
- Reflective elements: When moving in low visibility, prefer models with reflective details; these do not replace active lighting.
- Silicone hems and strips: May leave marks; if uncomfortable pressure or irritation occurs, choose a different model.
Cleaning, Maintenance, and Storage
- Washing: Wash inside out according to the label, at low temperatures and without fabric softener (which reduces elasticity and sweat wicking); do not use bleach.
- Drying: Air dry freely; avoid tumble drying and direct heat, which can damage elastane and bonded seams.
- Maintenance: After training, set aside and dry to reduce irritation risk; do not sew damaged seams or tears with thick thread, replace the product instead.
Specific Health Warnings
- Allergies and sensitive skin: Some dyes, latex/silicone elements, or elastane may cause reactions; discontinue use if redness, itching, or rash occurs.
- Circulation and nerves: Prolonged excessive pressure around the waist/thighs may cause numbness; choose milder compression and take breaks.
- Hygiene: Replace leggings after intense sweating; prolonged moisture promotes skin irritation.
Disposal
- Sorted waste: Deliver textiles to textile collection points; separate plastic accessories (zippers, labels) according to local regulations. Render damaged elastic parts unusable to prevent further use.
Incidents and Contact
- In case of an incident (allergic reaction, abrasions, injury due to material tearing), immediately stop using the product and seek medical assistance if necessary. Keep the product and proof of purchase for complaint processing.
Responsible person in the EU
Marček 80, 013 32 Svederník, Slovenská republika
Email: info@harahu.com
This information is provided in accordance with Regulation (EU) 2023/988 on general product safety. For more information about product safety, contact the manufacturer or responsible person.